WRC-27 Agenda Items · 1.1–1.19 and 7 (Topics A–E)

Data as of30 Oct 2026
CPM27-25–15 Apr 2027, Geneva
WRC-2718 Oct–12 Nov 2027, Shanghai
Draft CPM Draft CPM text Working doc Working document towards draft CPM text Res. NNN Resolution WP doc Chair's report CPM text TIES login

Source: methods and status are from the latest draft CPM texts on TIES (read 30 Oct 2026). WP 4A: AI 1.1–1.6 and 7 A–E use the draft CPM text TDs of the 19–29 Oct 2026 meeting (R23-WP4A-261019-TD; posted 28–29 Oct).

AIShort nameDescriptionFrequency bandsResp. WPLatest developments · draft CPM methods · source documentsControversiesBR issues
1.1 Aero & maritime ESIM, Q/V bandRes. 176 (Rev.WRC-23)Draft CPM Technical and operational conditions for aeronautical and maritime ESIM that communicate with GSO and non-GSO FSS space stations.
  • 47.2–50.2 GHz (E-s)
  • 50.4–51.4 GHz (E-s)
WP 4A

Draft CPM text, WG 4A2, TD 0340 (29 Oct 2026). Supporting material in TD 0347. Method A reason: studies not completed.

  • ANOC to RR Volumes 1 and 2 [and SUP Res. 176].
  • BNew footnote No. 5.A11 with two new WRC Resolutions (A-ESIM, M-ESIM; GSO and non-GSO) giving technical, operational and regulatory conditions. SUP Res. 176.

In CPM text

  • NCMC rules: WRC Resolution or ITU-R Recommendation — disputed (Editor's note).
  • Three options remain for the BR pfd examination method.
  • RAS protection options not agreed (no RAS allocation in band).

Regional positions

  • ATU Mandatory WRC Resolution for NCMC.
  • CEPT NCMC text in a Recommendation; ASMG same.
  • RCC Supports with incumbent protection.
  • Method B: BR examines A-ESIM characteristics against pfd limits at the Earth's surface (Annex 1, Part II); qualified favourable finding under No. 11.31 if successful, otherwise unfavourable.
  • [resolves 1.2.5]: if BR cannot examine, the Resolution stays in abeyance until an examination method is available.
  • BR examines App. 4 data against notified typical earth stations and publishes in the BR IFIC. Commitment with App. 4; reminder, then RRB after 30 days if interference persists.
1.2 Smaller FSS uplink antennas 13.75–14 GHzRes. 129 (WRC-23)Draft CPM Revise RR Nos. 5.502 and 5.503 to permit smaller FSS uplink earth stations (now min. 1.2 m GSO, 4.5 m non-GSO). Protect radiolocation (5.502) and SRS (5.503).
  • 13.75–14 GHz (E-s)
WP 4A

Draft CPM text, WG 4A2, TD 0341 (29 Oct 2026). Two issues; methods reduced to A1–A4 and B1–B3. Working document in TD 0349. All methods: SUP Res. 129.

  • A1Issue A (No. 5.502, RLS): no change.
  • A2Remove min. antenna sizes (GSO 1.2 m, non-GSO 4.5 m). New No. 21.13B: non-GSO e.i.r.p. density limit that falls as deployment density rises.
  • A3GSO: remove min. antenna size and pfd limits; delete 68 dBW lower e.i.r.p. value for ≥ 4.5 m; MOD App. 4. Alt. 2 adds No. 5.502A.
  • A4Remove antenna size limits; keep the current pfd limit of No. 5.502.
  • B1Issue B (No. 5.503, SRS): no change.
  • B2SUP No. 5.503 (RoP on 5.503 to review).
  • B3Keep primary status of pre-1992 GSO SRS stations; remove the e.i.r.p. limit on FSS earth stations.

In CPM text

  • A2: no ITU-R studies for non-GSO < 4.5 m or for removing e.i.r.p. limit ≥ 4.5 m.
  • A3: radar protection criterion in RR text without agreed compliance procedure.
  • A4: pfd at 3 m above ground does not protect airborne radars.
  • B1: keeps unequal GSO (10 MHz) / non-GSO (6 MHz) protection; B2: loss of pre-1992 SRS primary status, no studies.

Regional positions

  • RCC Supports smaller antennas and power limits via 5.502/5.503.
  • CEPT Change only with accepted studies protecting RLS, RNS, SRS.
  • CITEL Split; some want no new constraints on RLS/SRS.
  • APT Studies; protect RLS.
  • Changes to Nos. 5.502/5.503 change what BR examines for FSS earth stations at 13.75–14 GHz (antenna size, pfd, e.i.r.p.).
  • A2: new No. 21.13B limit linked to deployment density (App. 4 A.4.b.7.b) — new data item to check.
  • B2: Rules of Procedure on No. 5.503 to review; B3 keeps the 31 Jan 1992 API date criterion.
1.3 Non-GSO FSS gateways 51.4–52.4 GHzRes. 130 (WRC-23)Draft CPM Use of 51.4–52.4 GHz by gateway earth stations that transmit to non-GSO FSS systems. Protect GSO FSS, FS, MS, RAS and EESS (passive) 52.6–54.25 GHz.
  • 51.4–52.4 GHz (E-s)
WP 4A

Draft CPM text, WG 4A1, TD 0314 (28 Oct 2026). Working document in TD 0315. All methods: only non-GSO gateways, SUP Res. 130, Res. 750 update.

  • Aepfd (E-s) limits in Table 22-2 to protect GSO FSS. Band stays under Art. 9 Section I (no No. 9.12).
  • BExtend Nos. 22.5L/22.5M (and Res. 769/770) to 51.4–52.4 GHz. Non-GSO/non-GSO coordination under No. 9.12.
  • CAs B, plus transitional single-entry epfd limits until BR validation software for No. 22.5L is available. May be deleted at CPM27-2 if software is ready.

In CPM text

  • Protection of GSO: epfd limits (A) vs Nos. 22.5L/22.5M (B, C).
  • Method C exists only because BR validation software is not ready.

Regional positions

  • CEPT Supports framework protecting RAS and EESS; RCC, ATU similar.
  • ASMG Keep No. 5.555C unchanged.
  • Method C exists because BR validation software for No. 22.5L at 51.4–52.4 GHz is not available. CPM27-2 can delete Method C if BR confirms the software is ready or expected before WRC-27 decisions apply.
  • Method A: new epfd limits — BR epfd examination (Rec. S.1503 software).
  • Methods B/C: Res. 770 consultation; convener sends aggregate results and supplemental GSO links to BR for publication; draft text: no BR finding on compliance under Art. 9/11.
1.4 17 GHz FSS/BSS downlink, Region 3Res. 726 (WRC-23)Draft CPM Possible new FSS (s-E) allocation 17.3–17.7 GHz and BSS allocation 17.3–17.8 GHz in Region 3. epfd limits for non-GSO FSS.
  • 17.3–17.7 GHz FSS (s-E, R3)
  • 17.3–17.8 GHz BSS (s-E, R3)
WP 4A

Draft CPM text, WG 4A2, TD 0342 (29 Oct 2026). Seven methods (new Method B2). Working document in TD 0350.

  • ANo change. SUP Res. 726.
  • BR3: GSO FSS (s-E) 17.3–17.7 GHz and BSS 17.3–17.8 GHz.
  • B2As B, with a pfd mask from a study that protects the full visible GSO arc, for GSO FSS and BSS.
  • CR3 FSS (s-E) for GSO and non-GSO; R2 epfd limits to R1 and R3; neutral on R3 BSS.
  • DR3 FSS (GSO, non-GSO) and BSS; R2 epfd limits to R1 and R3; new Table 22-1D epfd to protect BSS.
  • ER3 FSS (GSO, non-GSO) and BSS; R2 epfd limits to R1 and R3.
  • FAs C, with other additional regulatory provisions (GSO FSS reciprocity in all Regions).

In CPM text

  • Method B2 questions use of R2 values with no supporting technical studies.
  • Methods C and F stay neutral on a Region 3 BSS allocation.

Regional positions

  • CEPT Apply WRC-23 R2 epfd in R1 and R3; no view on R3 BSS.
  • ATU Protect R1 and App. 30A feeder links; study R1 epfd.
  • RCC Only if R1 GSO is protected.
  • APT Studies, incl. epfd.
  • Methods C–F: R2 epfd limits applied in R1 and R3; D adds a new Table 22-1D (BSS) — BR epfd examination and software to extend.
  • New R3 FSS (s-E) and BSS allocations; B2 adds a pfd mask — BR examination against new limits; interaction with App. 30A feeder links.
  • Rules of Procedure on No. 9.19 cited.
1.5 Unauthorized non-GSO terminalsRes. 14 (WRC-23)Draft CPM Regulatory measures to limit unauthorized operation of non-GSO FSS and MSS earth stations in a territory without licence, and service-area inclusion rules.
  • No specific band (non-GSO FSS/MSS earth stations)
WP 4A

Draft CPM text, WG 4A3, TD 0359 (29 Oct 2026). Four methods, some with options and variants. All: SUP Res. 14.

  • ANo change. Art. 18 and Res. 22/25 (Rev.WRC-23) are adequate; guidance via ITU-R Recs/Reports possible.
  • BNew Res. [A15-B]: geolocation to restrict unauthorized use; remote de-activation.
  • CNew Res. [A15-C]: mandatory measures, immediate remote de-activation; service-area exclusion; RRB review and BR measures on the non-GSO assignments.
  • DMOD Res. 22: geolocation and remote control; reporting; RRB review with possible suspension/suppression of assignments.

In CPM text

  • B: prescriptive; mandatory geolocation and NCMC location; not technology-neutral; inconsistent with studies.
  • C: permanent NCMC monitoring; territory exclusion ineffective; covers reception; no safety exemption; BR burden.
  • Exclusion-of-service-area procedure for BR/RRB is unclear.

Regional positions

  • CEPT Opposes service-area limits and territory exclusion; current rules suffice.
  • RCC Supports exclusion of territory on request.
  • APT Split: current framework vs mandatory suspension.
  • CITEL Six divergent views.
  • Methods C/D: administrations report suspected unauthorized operation to BR; BR and RRB actions with time limits.
  • RRB review can lead to suspension/suppression of the non-GSO assignments in the BR database and MIFR.
  • Concerns in text: BR examination and reporting add administrative burden; exclusion-of-service-area procedure for BR/RRB is unclear; a new coordination with interim non-GSO filings would increase BR workload.
1.6 Equitable access, Q/V-band FSSRes. 131 (WRC-23)Draft CPM Technical and regulatory measures for equitable access to FSS spectrum and orbit in Q/V bands, with the needs of developing countries. No new allocations.
  • 37.5–42.5 GHz (s-E)
  • 42.5–43.5 GHz (E-s)
  • 47.2–50.2 GHz (E-s)
  • 50.4–51.4 GHz (E-s)
WP 4A

Draft CPM text, WG 4A3, TD 0360 (29 Oct 2026). Scope of Methods B–D now differs by orbit type. All: SUP Res. 131.

  • ANo change (first-come first-served kept). SUP Res. 131.
  • BOne new Resolution [A16-B] for GSO networks: preferential treatment for administrations or groups of named administrations.
  • CTwo new Resolutions: [A16-C-GSO] and [B16-C-NGSO] (non-GSO system on behalf of a large group of administrations).
  • DOne new Resolution [A16-D] for GSO and non-GSO: differentiated preferential treatment.

In CPM text

  • Measurement campaigns: downlink only; assume fixed operations; cost for ITU-R.
  • No fixed BIU deadline = de facto Plan; blocks new entrants (CS Art. 44).

Regional positions

  • CEPT Opposes a priori planning and retroactivity.
  • ATU Supports Method C and removal of 7-year BIU.
  • RCC Planning not feasible; prefers Res. 553-type procedure.
  • Methods B–D: preferential treatment changes first-come first-served processing; BR eligibility checks.
  • Measurement campaigns: BR could assist, subject to resources; text notes significant cost for ITU-R.
  • BR examination of probability of harmful interference under No. 11.32A could take these principles into account.
  • No re-processing of networks already processed. BR data (May 2025): about 900 GSO networks, about 50 brought into use.
1.7 IMT in 4.4, 7–8 and 15 GHzRes. 256 (WRC-23)Draft CPM Sharing and compatibility studies and technical conditions for IMT identification. Protect existing primary services, also in international waters and airspace.
  • Band 1: 4 400–4 800 MHz (R1, R3)
  • Band 2: 7 125–7 250 MHz (global)
  • Band 3: 7 250–7 750 MHz (R2, R3)
  • Band 4: 7 750–8 400 MHz (global)
  • Band 5: 14.8–15.35 GHz (global)
WP 5D

Draft CPM text, 5D/1546 Annex 4.31 (15 Oct 2026), from WP 5D #53. Methods per band; method 'A' in each band is No change.

  • 1A–5ANo change in the band.
  • 1B1–1I4.4 GHz: IMT ID with explicit agreement (1B1) or pfd limits (1B2, 1G); footnote for some countries / parts + Res. 223 (1D, 1F, 1H); use under existing MS by arrangements (1E); constraints (1I).
  • 2C–2F7 125–7 250 MHz: IMT ID by footnote with new Resolution or alternative elements.
  • 3C–3H7 250–7 750 MHz: IMT ID by footnote with conditions in Resolution; 3E extends to R1.
  • 4B–4E7 750–8 400 MHz: IMT ID by footnote and new Resolution; 4B includes conditions for space services.
  • 5B–5C14.8–15.35 GHz: IMT ID by footnote with new Resolution (5B) or constraints (5C).

In CPM text

  • Added methods for R2 at 4.4–4.8 GHz and R1 at 7.25–7.75 GHz — others say out of scope.
  • Some methods 'may contradict the RR' (1I, 2F).
  • Dispute on reliance on into-IMT studies, protection of AMS/MMS in international airspace/waters and RAS 4 990–5 000 MHz.

Regional positions

  • CEPT Opposes 4.4–4.8 and 14.8–15.35 GHz; 7.125–7.25 GHz possible.
  • RCC Supports 4.4–4.8, 7.125–7.25, 14.8–15.35 GHz.
  • APT Japan, Korea for; China and others against.
  • CITEL Eight administrations support more IMT.
  • ASMG Protect FSS 4.5–4.8 GHz and altimeters.
  • IMT notifying administration sends commitments with App. 4 data. If no action, BR sends a reminder; after 30 days, the case goes to the RRB.
  • Methods with pfd limits (e.g. −154.5 dB(W/(m²·4 kHz)) at 3 m, as for 3.4 GHz): in disagreement, BR calculates and verifies the pfd.
  • IMT assignments notified under Art. 11 (Nos. 11.13, 11.14).
1.8 Radiolocation 231.5–700 GHz imagingRes. 663 (Rev.WRC-23)Draft CPM Possible primary radiolocation allocation (Issue A) and identification (Issue B) for millimetric and sub-millimetric imaging. Protect EESS (passive), RAS, FS, LMS.
  • Issue A: 231.5–275 GHz (allocation)
  • Issue B: 275–700 GHz (identification)
WP 5B

Draft CPM text, 5B/526 Annex 4.1 (26 Jun 2026). Studies: most suitable bands 252–296 GHz and 356–439 GHz.

  • A1No change.
  • A2Allocate 252–275 GHz to RLS.
  • B1No change.
  • B2Identify 275–296 GHz and 356–439 GHz for RLS.
  • B2bisIdentify 275–296 GHz, 325–470 GHz and 640–690 GHz for RLS.

In CPM text

  • No concerns recorded. Supporting Rec. and Report still draft (square brackets).

Regional positions

  • CEPT Supports; opposes 250–252 GHz; RCC same.
  • ASMG Confirm the need first.
  • No Bureau-specific action in the draft CPM text.
1.9 HF AM(OR)S modernization, App. 26Res. 411 (WRC-23)Draft CPM Update Appendix 26 for wideband digital AM(OR)S emissions by aggregation of 3 kHz channels, without change to the existing Plan.
  • HF AM(OR)S bands of App. 26 (3 025–18 030 kHz)
WP 5B

Draft CPM text, 5B/526 Annex 4.3 (25 Jun 2026). Studies: contiguous and non-contiguous aggregation meet App. 27 unwanted emission limits. All methods: SUP Res. 411.

  • ANo change (NOC).
  • B1MOD App. 26 for channel aggregation; power limits for contiguous aggregated channels separate from single 3 kHz channels.
  • B2MOD App. 26 for channel aggregation; one power limit for aggregated and single 3 kHz channels.

In CPM text

  • No concerns recorded.

Regional positions

  • CEPT Non-contiguous aggregation in App. 26.
  • RCC Wideband OOB not above narrowband.
  • ASMG No change to the allotment Plan.
  • Method B: new 26/7ter — wide-band (aggregated) channels notified and recorded in the MIFR if in full conformity with App. 26. BR examination of aggregated channels and power limits.
1.10 Art. 21 pfd/e.i.r.p., 71–76 / 81–86 GHzRes. 775 (Rev.WRC-23)Draft CPM pfd and e.i.r.p. limits in Article 21 for FSS, MSS and BSS to protect fixed and mobile services.
  • 71–76 GHz (s-E): pfd mask
  • 81–86 GHz (E-s): e.i.r.p.
WP 5C

Draft CPM text, 5C/322 Annex 2.3 (12 Jun 2026). One method, five pfd options. No-change method stated as not applicable.

  • ATable 21-4 pfd mask for FSS/BSS/MSS at 71–76 GHz; add 81–86 GHz to Table 21-3 (Nos. 21.8, 21.11); App. 7 update; SUP Res. 775.
  • A1, A2pfd (1 MHz) from −115 (A1) or −122 (A2) at δ ≤ 5° to −105 dB(W/m²) at δ > 25°, GSO and non-GSO.
  • A3, A4Separate masks: GSO from −120/−115, non-GSO from −125 dB(W/m²). A4 adds gas-attenuation footnote and MOD No. 21.16.
  • A5Mask −115 − X, X a function of number of visible satellites (Nv > 300).

In CPM text

  • Studies with different assumptions give different pfd masks (options A1–A5). No-change method excluded.

Regional positions

  • CITEL Split: terrestrial vs satellite priority.
  • CEPT Limits from FS criteria; RCC, ATU, ASMG support limits.
  • APT No view yet.
  • New Art. 21 pfd mask (71–76 GHz) and e.i.r.p. limits (81–86 GHz) — BR examination; App. 7 coordination contour update.
  • Option A4: for pfd compliance, BR first applies a gas-attenuation reduction to the notified max. e.i.r.p. (new footnote, MOD No. 21.16); otherwise BR assessment stays free-space.
  • MSS filings already in the MIFR; BR gave characteristics for studies.
1.11 MSS space-to-space links, L/S bandRes. 249 (Rev.WRC-23)Draft CPM Technical, operational and regulatory provisions for space-to-space links between non-GSO and GSO satellites in existing MSS bands.
  • 1 518–1 544 MHz
  • 1 545–1 559 MHz
  • 1 610–1 645.5 MHz
  • 1 646.5–1 660 MHz
  • 1 670–1 675 MHz
  • 2 483.5–2 500 MHz
WP 4C

Draft CPM text, 4C/943 Annex 1 (23 Oct 2026). Studies: feasibility is band-dependent. All methods: SUP Res. 249.

  • ANo change to the RR.
  • BNew MSS (s-s) or ISS allocations in all or parts of the bands, with new Res. [A111-Bx]. Sub-methods B1–B8:
  • B2, B3, B7Add space-to-space direction indicator to existing MSS allocations (band sets differ).
  • B4, B8s-s indicator only in 1 610–1 626.5 MHz (B8: [1 614.8…1 618.92]–1 626.5 MHz); no change in other bands.
  • B1, B5, B6B1: secondary MSS (s-s) or ISS in 1 525–1 559 MHz; B5: TBD, no change at 2.4 GHz; B6: primary ISS in 1 525–1 559, 1 626.5–1 660 MHz.

In CPM text

  • A: no framework, uncertainty. B1: secondary + hard pfd limits, basis unclear.
  • B2/B3: RAS 1 610.6–1 613.8 MHz already exceeded (RA.769); guardband inconsistency.
  • B4: protection under resolves 4 unclear.

Regional positions

  • RCC Opposes s-s in 1 518–1 535 and 1 610–1 626.5 MHz; ISS only.
  • CEPT Supports s-s in MSS bands; ATU, ASMG, CITEL same direction as MSS.
  • Notifying administration sends App. 4 data for the non-GSO user space station. If BR finds no recorded typical earth stations for the GSO MSS provider network, BR returns the information.
  • Max. off-nadir angle derived from notified service area (GIMS database).
  • Director: implement Resolution, assist in resolving interference, report difficulties to future WRCs.
1.12 Low-data-rate non-GSO MSSRes. 252 (WRC-23)Draft CPM Possible MSS allocations, limited to non-GSO low-data-rate (LDR) systems with burst data and no telephony, and regulatory actions.
  • Band 1: 1 427–1 432 MHz (s-E)
  • Band 2: 1 645.5–1 646.5 MHz
  • Band 3: 1 880–1 920 MHz
  • Band 4: 2 010–2 025 MHz (s-E, E-s)
WP 4C

Draft CPM text, 4C/943 Annex 5 (19 Oct 2026). Methods band by band. Overlap with AI 1.13 and 1.14. SUP Res. 252.

  • 1A–4ANo change in the band.
  • 1B–4BPrimary MSS allocation with new Res. [A112]: pfd (s-E) and terminal e.i.r.p. density (E-s) limits.
  • 1C–4CSecondary MSS by footnote with Res. [A112]; 2C uses existing E-s allocation; keeps R2 primary MSS (E-s) 2 010–2 025 MHz (No. 5.389C).

In CPM text

  • Some say methods ignore study results; others say studies not reviewed, based on specific systems.
  • 1 645.5–1 646.5 MHz unused; IMO removed 1.6 GHz EPIRBs.

Regional positions

  • RCC Objects to 1 427–1 432 MHz.
  • CITEL Supports bands from 1 427 MHz.
  • ATU Global allocation; 1 645.5 MHz awaits IMO.
  • CEPT Global allocation; avoid first-come monopolies.
  • New Res. [A112] with pfd (s-E) and terminal e.i.r.p. limits for non-GSO LDR MSS — limits to examine.
  • Director: take all actions to facilitate implementation.
1.13 Direct-to-device MSS in IMT bandsRes. 253 (WRC-23)Draft CPM Possible new MSS allocations for direct connectivity between space stations and IMT user equipment (DC-MSS-IMT), to complement terrestrial IMT coverage.
  • Group 1: 694/698–960 MHz
  • Group 2: 1 427–1 518 MHz
  • Group 3: 1 710–2 025, 2 110–2 200 MHz
  • Group 4: 2 300–2 400 MHz
  • Group 5: 2 500–2 570, 2 620–2 690 MHz
WP 4CWP 5D

Draft CPM text, 4C/943 Annex 7 (23 Oct 2026), WP 5D input on IMT protection. Studies on downlink only (uplink unchanged, existing UE). New Resolution for DC-MSS-IMT; SUP Res. 253.

  • 1A–5ANo change in the group.
  • 1B–5BPrimary MSS allocation limited to DC-MSS-IMT (Table of Allocations + new footnote).
  • 1C–5CSecondary MSS allocation limited to DC-MSS-IMT.
  • 1D–5DSecondary MSS allocation via RR footnote only.

In CPM text

  • Study results differ widely; no conclusion possible (Editor's note).
  • Some IMT studies not compliant with agreed protection criteria.
  • Four alternatives on MNO / DC-MSS-IMT arrangements not agreed.

Regional positions

  • ATU Secondary only, with MNO agreements; ASMG same.
  • CEPT Supplemental framework in IMT bands; opposes 2 300–2 400 MHz.
  • RCC Opposes 2 110–2 200, 2 305–2 360 MHz.
  • APT Studies only.
  • BR examines compliance with aggregate pfd/epfd limits with the methodology in Attachment 2 (draft resolves 19).
  • Operation in abeyance until the required verification software is available (resolves 21bis).
  • Alt. 1: BR to prepare a database of frequency channels used by each DC-MSS-IMT system.
  • All mandatory App. 4 elements to BR for examination (No. 11.15).
1.14 Additional MSS allocations ~2 GHzRes. 254 (WRC-23)Draft CPM Possible new MSS allocations in three bands near 2 GHz, with protection of existing primary services in-band and adjacent, without new constraints on them.
  • Band 1: 2 010–2 025 MHz (E-s, R1 & R3)
  • Band 2: 2 120–2 160 MHz (s-E, all Regions)
  • Band 3: 2 160–2 170 MHz (s-E, R1 & R3)
WP 4C

Draft CPM text, 4C/943 Annex 9 (21 Oct 2026). Methods band by band, plus one method for no change in all bands.

  • 1A–3ANo change in the band.
  • 1B–3BMSS allocation on a primary basis.
  • 1C–3CMSS allocation on a secondary basis.
  • DNo change for all bands.

In CPM text

  • Conditions in 1B/1C/2B/2C/3B/3C not supported by studies (concern).
  • Considerings not agreed.

Regional positions

  • CEPT Opposes 2 120–2 170 MHz; no change. RCC same in R1.
  • ATU Supports; ASMG, CITEL (5 admins) also.
  • pfd limit at borders for 2 010–2 025 MHz ([−107/−114] dB(W/(m²·MHz))); verification by mutual agreement of administrations.
  • Conditions before bringing into use of MSS space stations in 2 120–2 170 MHz to protect MS.
1.15 Lunar communications (SRS)Res. 680 (WRC-23)Draft CPM SRS (space-to-space) allocations for lunar surface and lunar orbit–surface links. Protect incumbents on the Moon and on Earth, and the Shielded Zone of the Moon (SZM).
  • A–C: 390–406.1, 420–430, 440–450 MHz
  • D–E: 2 400–2 690, 3 500–3 800 MHz
  • F–H: 5 150–5 570, 5 570–5 725, 5 775–5 925 MHz
  • I–J: 7 190–7 235, 8 450–8 500 MHz
  • K: 25.25–28.35 GHz
WP 7B

Draft CPM text, 7B/279 Annex 2 (1 Oct 2026). Issues A–K, one per band. All methods: SUP Res. 680.

  • A1–K1No change in the band.
  • A2–C2Primary SRS (s-s) allocation, use outside the SZM only.
  • D2–J2Primary SRS (s-s) allocation.
  • K2Primary SRS (s-s) allocation in 27.5–28.35 GHz only.

In CPM text

  • No concerns recorded. K2 limited to 27.5–28.35 GHz.

Regional positions

  • CEPT Supports; protect the Shielded Zone of the Moon.
  • RCC 7 190–7 235, 8 450–8 500 MHz with channel plan.
  • New SRS (s-s) allocations for lunar links — notification of stations on and around the Moon; SZM limits.
  • Alt. 1: Director instructed to evaluate impacts on RAS in the SZM for several bands.
1.16 RAS protection from non-GSO, RQZRes. 681 (WRC-23)Draft CPM Protect RAS from non-GSO unwanted emissions (Issue A), multi-system aggregate (B), recognize two RQZ sites (C), RQZ impact (D).
  • 10.6–10.7 GHz
  • 42.5–43.5 GHz
  • 76–77.5 GHz
  • 94.1–95, 100–102 GHz
  • 130–134 GHz
  • 114.25–116 GHz: out of scope (NOC)
WP 7D

Draft CPM text, 7D/329 Annex 1 (2 Oct 2026). Studies for Issues A, B, D broadly agree. All: SUP Res. 681.

  • A1No change.
  • A2–A4New Art. 5 footnotes + App. 4: mandatory thresholds (A2); no harmful interference 'to the extent practicable', App. 4 optional (A3); per protection criteria (A4).
  • B1No change.
  • B2, B3Resolution: ITU-R to finish Report/Recs (B2); new Resolution on aggregate interference with consultation mechanism (B3).
  • C1–C4No change (C1); recognize two RQZ in Art. 22 + Resolution (C2), in Art. 29 + Resolution (C3), Art. 29 only (C4).
  • DNo change.

In CPM text

  • A1: studies show RAS exceedance. A2: few systems studied. A3: 'to the extent practicable' weakens. A4: no compliance method.
  • B2: not needed / out of scope. B3: voluntary, may give no result.
  • C: definitions outside the RR; supporting Resolution.

Regional positions

  • CEPT Footnotes for 10.6–10.7, 100–102, 114.25–116 GHz (CPM: 114.25–116 out of scope).
  • RCC No unjustified constraints; RQZ under No. 4.6.
  • CITEL Split.
  • A2–A4: App. 4 commitments (epfd limits, 'to the extent practicable' in A3) submitted to BR with the filing.
  • B3: new consultation mechanism for aggregate interference from multiple non-GSO systems.
  • C2–C4: two RQZ named in Art. 22 or Art. 29.
1.17 Space weather sensors (MetAids)Res. 682 (WRC-23)Draft CPM Primary MetAids (space weather) allocations limited to receive-only sensors, and MIFR registration. Sensors cause no interference; studies cover impact on the sensors.
  • 27.5–28.0 MHz
  • 29.7–30.2 MHz
  • 32.2–32.6 MHz
  • 37.5–38.325 MHz
  • 73.0–74.6 MHz
  • 608–614 MHz
WP 7C

Draft CPM text, 7C/434 Annex 2 (1 Oct 2026). Three methods.

  • APrimary MetAids (space weather) in all six bands. MOD Art. 5, Art. 11 and App. 4 Annex 1.
  • BSame in five bands (not 608–614 MHz). MOD Art. 5 and App. 4 Annex 1; no change to Art. 11.
  • CBand-by-band allocations, with the regulatory provisions of Method A.

In CPM text

  • No concerns recorded. Methods A vs B differ on 608–614 MHz.

Regional positions

  • ATU Doubts 608–614 MHz (African use); ASMG same.
  • CEPT Supports all bands; RCC all six bands.
  • Method A: new No. 11.12bis — notification and MIFR recording of receive-only MetAids land stations; Nos. 11.31–11.34 adapted; new App. 4 Annex 1 items.
  • Method B: no Art. 11 change (no MIFR recording).
1.18 Unwanted emissions >76 GHz vs passiveRes. 712 (WRC-23)Draft CPM Regulatory measures to protect EESS (passive) (Issue A, resolves 1) and RAS (Issue B, resolves 2) above 76 GHz from unwanted emissions of active services in adjacent bands.
  • EESS: Res. 712 Table 1 bands (e.g. 86–92, 114.25–116, 164–167, 200–209 GHz)
  • RAS / active: 76–81 / 71–76, 130–134 / 123–130, 164–167 / 167–174.5, 226–231.5 / 232–235 GHz
WP 7CWP 7D

Draft CPM text, 7C/434 Annex 3 (2 Oct 2026), joint text with 7D/329 Annex 4 (resolves 1 and 2). Two methods for Issue A, eight for Issue B.

  • A1Issue A: add unwanted emission limits to Res. 750 (four parts, alternatives where active-service data are missing).
  • A2Issue A: no change.
  • B1Issue B: no change.
  • B2Revise Res. 739: five sub-methods (threshold tables, body, footnotes, App. 4 commitments). B2.4 is mandatory.
  • B3Add a commitment in App. 4.
  • B4New mandatory Art. 5 footnotes with emission limits, plus App. 4 commitment.

In CPM text

  • B2.3: power vs epfd threshold justification wrong.
  • B2.4: binding limits in consultation-based Res. 739 — bad precedent.
  • B3: 'to the extent practicable' changes meaning.

Regional positions

  • CEPT Res. 750 update; RA.769 thresholds.
  • ASMG No limits on active services.
  • B2.4: binding epfd/pfd limits through an App. 4 commitment that the Bureau verifies.
  • Other B methods: BR makes no examination or finding (draft resolves 3); text says no additional burden on BR.
  • B3/B4: new App. 4 commitment.
1.19 EESS (passive) 4.2–4.4 & 8.4–8.5 GHzRes. 674 (WRC-23)Draft CPM Possible primary EESS (passive) allocations in all Regions, without protection from existing services in-band and in adjacent bands.
  • Band 1: 4 200–4 400 MHz
  • Band 2: 8 400–8 500 MHz
WP 7C

Draft CPM text, 7C/434 Annex 4 (1 Oct 2026). Studies vs RS.2017 protection criteria.

  • 1A4.2 GHz: no change.
  • 1B–1DPrimary EESS (passive), no protection claim from in-band services (1B), also LMS upper adjacent (1C), also both adjacent bands (1D).
  • 2A8.4 GHz: no change.
  • 2B–2DPrimary EESS (passive), no protection from in-band services + no high-density MS footnote (2B), also FSS (E-s) lower adjacent (2C), also both adjacent (2D).

In CPM text

  • Method 2B (no high-density MS footnote) said out of scope of Res. 674.

Regional positions

  • CEPT EESS protected from IMT.
  • RCC No protection, no constraints; ATU, ASMG same.
  • No Bureau-specific action in the draft CPM text.
Agenda item 7 — Res. 86 (Rev.WRC-07): satellite network procedures (advance publication, coordination, notification, recording)
7 A Appendix 4 data itemsRes. 86 (Rev.WRC-07)Draft CPM Modifications to Appendix 4 data items.
  • —
WP 4A

Draft CPM text, WG 4A3, TD 0343 (29 Oct 2026), from 4A/1064 Annex 15.

  • AMOD App. 4 Annex 2 data items A.4.b.7.d.1, A.4.b.7.d.2, A.27.b and C.8.b.3.c.

In CPM text

  • Text calls it straightforward and non-controversial.

Regional positions

  • — No topic-level position found.
  • Topic raised by BR: App. 4 Annex 2 gaps caused difficulties for BR examination (e.g. Nos. 5.475A, 5.478A). RRB Rules of Procedure correct this for now; RR change makes it permanent.
7 B New coordination arc > 3.4 GHzRes. 86 (Rev.WRC-07)Draft CPM Add coordination arcs to App. 5 Table 5-1 for No. 9.7 cases where only ΔT/T applies today (mostly MSS). Bands below 3.4 GHz excluded.
  • 10.7–10.95, 11.2–11.45 GHz (R1, E-s)
  • 13.4–13.65 GHz (R1), 14–14.5 GHz
  • 39.5–40.5, 40.5–41 (R2), 43.5–47 GHz
  • 50.4–51.4, 66–71, 71–74, 81–84 GHz
WP 4A

Draft CPM text, WG 4A3, TD 0344 (29 Oct 2026). New Method B4 (no change). Band list revised: 10.7–10.95 and 11.2–11.45 GHz (R1) replace 10.7–11.7 GHz; [123–130] and [252–265] GHz removed.

  • B1±16° in all listed bands.
  • B2±8° (10.7–14.5 GHz), ±6° (39.5–47 GHz), ±4° (50.4 GHz and above).
  • B3±8° in all listed bands.
  • B4No change to App. 5 Table 5-1 (also possible band by band).

In CPM text

  • Arc values differ (±4° to ±16°); new Method B4 (no change).

Regional positions

  • CITEL One administration supports arc review.
  • Fewer coordination requirements under ΔT/T and fewer No. 9.41 requests and No. 11.41 notifications — lower BR workload.
  • App. 5 Table 5-1 change applies in BR identification of coordination requirements.
7 C Revision of Res. 170 (App. 30B)Res. 86 (Rev.WRC-07)Draft CPM Revise Res. 170 (Rev.WRC-23): additional measures for satellite networks in the FSS under Appendix 30B.
  • App. 30B bands
WP 4A

Draft CPM text, WG 4A3, TD 0361 (29 Oct 2026), from 4A/1064 Ann. 17, 4A/1106, 4A/1255. New Method C3.

  • C1No change.
  • C2One national network plus up to two group networks per administration; no fixed BIU time limit; extra coordination procedure for critical cases.
  • C3Restructure Attachment 1; repeat procedure one at a time; ignore pre-2009 List entries for eligibility; flat 0 dB coverage in service area; time to correct Art. 21/22 excess; BIU extension with RRB approval.

In CPM text

  • C2: measurement campaigns cannot replace coordination.
  • No fixed BIU deadline = de facto Plan; blocks new entrants.

Regional positions

  • CEPT AI 7 general: fix only identified inconsistencies.
  • C3: BR generates the minimum ellipse but can give a flat 0 dB coverage in the service area; time to correct Art. 21/22 hard-limit excess before an unfavourable finding.
  • C2/C3: no fixed BIU time limit or BIU extension with RRB approval; BR processing of repeat submissions.
  • Measurement campaigns with BR assistance (resource and cost concern).
7 D Revision of Res. 553 (21.4–22 GHz BSS)Res. 86 (Rev.WRC-07)Draft CPM Revise Res. 553 (Rev.WRC-23): special measures for equitable access to BSS in 21.4–22 GHz in Regions 1 and 3.
  • 21.4–22 GHz (BSS, R1 & R3)
WP 4A

Draft CPM text, WG 4A3, TD 0362 (29 Oct 2026), from 4A/1064 Ann. 18 and later contributions. New Method D3.

  • D1No change.
  • D2One national network plus up to two group networks per administration; no fixed BIU time limit; extra coordination procedure for critical cases.
  • D3Two networks at a time (one national, one subregional group); BR generates flat 0 dB coverage in service area; BIU extension with RRB approval.

In CPM text

  • D2: measurement campaigns cannot replace coordination.
  • No fixed BIU deadline = de facto Plan; blocks new entrants.

Regional positions

  • CEPT AI 7 general: fix only identified inconsistencies.
  • D3: BR generates flat 0 dB coverage within the service area.
  • BR examines 21.4–22 GHz BSS with grid points in incumbent service areas; BIU extension with RRB approval (D3); no fixed BIU (D2).
  • Measurement campaigns with BR assistance; principles for No. 11.32A examination.
7 E RR No. 4.4 for space stationsRes. 86 (Rev.WRC-07)Draft CPM Potential regulatory improvements on application of RR No. 4.4 to space station frequency assignments.
  • —
WP 4A

Draft CPM text, WG 4A3, TD 0345 (29 Oct 2026), from 4A/1064 and contributions (KOR, MCP, CHN, AUS, RUS, CAN, USA).

  • E1No change. Rely on current framework and Rules of Procedure on No. 4.4.
  • E2MOD No. 9.3 (comments on No. 4.4 assignments) and No. 9.4 (no network change required for No. 4.4 cases). New App. 4 item: list of provisions not complied with; enables statistics.
  • E3New Resolution on No. 4.4 for space stations, new footnotes and App. 4 items; RoP on No. 4.4 incorporated; obligations, reporting and interference resolution.

In CPM text

  • Scope dispute: identification signals (Art. 19) and indirect changes to Arts. 4, 15, 19 said out of scope; text in square brackets.

Regional positions

  • CITEL One administration supports new measures (Resolution, App. 4 items).
  • Topic follows BR reports on increased use of No. 4.4 (WRC-19, WRC-23 Director's Report). BR has never received a harmful interference report from a No. 4.4 assignment.
  • E2: new App. 4 item (provisions not complied with) — BR checks and collects statistics.
  • E3: BR returns notices without call sign; publishes list of commenting administrations and summary; records lack of cooperation after [25] days; facilitates interference resolution, then reports to RRB after 60 days.